02 · Bathrooms

Bathroom Remodeling

Naperville, IL and surrounding areas

What's included

  • Full gut and waterproof membrane installation
  • Custom tile work: floor, wall, and niche
  • Pannello XL waterproof panel systems, single-day install
  • Steam showers, heated floors, freestanding tubs
  • Custom and semi-custom vanities
  • Plumbing fixture selection and installation
  • Lighting and ventilation
Request an Estimate
Timeline

Full custom tile bathrooms run 2–3 weeks, much of it setting and curing tile. Pannello XL wall panels install in a single day, cutting that part of the schedule out.

A faster option, when it fits

Some bathrooms don't need three weeks of tile work.

For a guest bath, powder room, or any space where custom tile isn't the point, we install Pannello XL waterproof wall panels, a click-together system that goes up in a single day with no grout to crack, stain, or reseal. It cuts out the week or more most bathrooms lose waiting on tile to set and cure.

Panel install
One day for the full wall system
Maintenance
No grout lines to crack, stain, or reseal
Waterproofing
Fully sealed, resilient panel system
Pannello XL marble-look waterproof wall panels in a shower, with brass fixtures and a wood vanity
How it works

A clear process, start to finish.

  1. Walkthrough & Consultation

    We come to you, look at the space, and talk through what you want it to look and feel like.

  2. Design & Material Selection

    You pick the cabinetry, countertops, tile, or trim the project calls for.

  3. Ordering & Scheduling

    Materials get ordered and the job gets scheduled around your life, not ours.

  4. Installation

    The work gets done right, start to finish.

  5. Final Walkthrough

    We walk the finished space together before we call it done.

Ready to talk about your project?

Most estimates take about an hour on site, no pressure, just a direct conversation about what it takes to build it well.

Request an Estimate

Frequently asked questions

How long does a bathroom remodel take?

Full custom tile bathrooms run two to three weeks, most of it spent setting and curing tile. If you go with Pannello XL waterproof wall panels instead, that part of the job installs in a single day, which can cut a week or more off the schedule.

Do I need a permit for a bathroom remodel?

If you're moving plumbing, changing the electrical, or altering the room's footprint, yes. A cosmetic refresh, like swapping a vanity or retiling in place, usually doesn't need one. We pull permits on any project that requires it.

What's the difference between tile and the Pannello XL panel system?

Tile gives you the most design flexibility, but it takes time to set and cure, and grout lines need upkeep over the years. Pannello XL is a waterproof panel system that installs in a single day with no grout to crack or reseal, a strong option for a guest bath, powder room, or anywhere you want a durable, low-maintenance finish.

Can you fix water damage from a leaking shower or tub?

Yes. If there's rot, mold, or subfloor damage behind an existing shower or tub, we deal with it during demo before anything new goes in. It's a big reason a full gut is often the safer call once a bathroom has had a leak, so you know what's actually behind the wall instead of covering it back up.

What materials do you work with?

Custom tile from trusted suppliers, plus Pannello XL waterproof panel systems for jobs that call for it.